I’ve been following my build from day one through the BMW Genius live chat and now and again it’s bounced back and forth between status codes.
I’m one of the lucky ones with my build complete and as of a couple of days ago it was at sea - status 195. I checked in today and it was status 193 again… the Genius was adamant it was right and that the next step would be 195 and my car would be at sea, again. I asked for his status codes list and here it is. There’s some differences to what I’ve seen before with 193 meaning a handful of things before bouncing back to 195. Turns out my car is in the UK and through the workshop awaiting dispatch. Might prevent others confusion and frustration nearing the end.
037 Model or feature unavailable
047 No quota available
088 Special request not scheduled
105 Cannot be scheduled
111 Scheduled
112 Scheduled for production
150 Planned for assembly
Chassis number allocated
Confirmed by production control
151 Bodyshop start
152 Paintshop start
153 Entry assembly
154 Assembly
155 Assembly complete
160 Transfer to distribution
182 Released to pre-haul carrier
190 Departed plant
193 Pre EU port of exit
193 EU port of exit
193 EU storage
195 At sea
193 UK port of entry
193 UK and IE storage
193 Open workshop job
193 En route to dispatch point
193 Awaiting dispatch
195 Dispatched
198 Arrived
I’m one of the lucky ones with my build complete and as of a couple of days ago it was at sea - status 195. I checked in today and it was status 193 again… the Genius was adamant it was right and that the next step would be 195 and my car would be at sea, again. I asked for his status codes list and here it is. There’s some differences to what I’ve seen before with 193 meaning a handful of things before bouncing back to 195. Turns out my car is in the UK and through the workshop awaiting dispatch. Might prevent others confusion and frustration nearing the end.
037 Model or feature unavailable
047 No quota available
088 Special request not scheduled
105 Cannot be scheduled
111 Scheduled
112 Scheduled for production
150 Planned for assembly
Chassis number allocated
Confirmed by production control
151 Bodyshop start
152 Paintshop start
153 Entry assembly
154 Assembly
155 Assembly complete
160 Transfer to distribution
182 Released to pre-haul carrier
190 Departed plant
193 Pre EU port of exit
193 EU port of exit
193 EU storage
195 At sea
193 UK port of entry
193 UK and IE storage
193 Open workshop job
193 En route to dispatch point
193 Awaiting dispatch
195 Dispatched
198 Arrived